SP 40-102-2000: Design of internal sewerage and watercourses


Uninterrupted drainage of used water is an important condition for the comfortable operation of an apartment, office, warehouse or production workshop. For each specific case, communications are arranged taking into account the operating mode of the facility, its location and other factors. A mandatory stage in creating a sewerage system is design. Proper work done at this stage guarantees that no problems will arise when using communications.

Submit your application

Based on the method of transporting wastewater, sewer networks are divided into:

  • Non-pressure - gravity (laid under a standardized slope)
  • Pressure pumps – transporting runoff after sewage pumping stations.
Mistakes in sewer design Recommendations of Region LLC when developing a sewerage project
  • The basis of the project that will ensure the removal of wastewater from your facility is the collection of loads - the wastewater balance.
  • The drainage balance is compiled based on the following data: For residential buildings: the number of people, the number of appliances (shower, bathtub, ...). For production facilities, as a rule, the main costs are for technological needs and a miscalculation in this matter can jeopardize the entire investment project. For small settlements and cities, the balance is compiled according to the population size, the degree of improvement of the development and the load from industry.
  • Errors in constructing hydraulic profiles of gravity sewerage pipelines (the slope or diameter of the pipeline is chosen incorrectly, the development prospects of the territories and possible connections are not taken into account) usually leads to significant capital costs for reconstruction or installation of a sewerage pumping station.
  • If the slope of the pipelines is not chosen correctly, then the speed of movement of the wastewater in the pipe is either too low or too high, which in the first case leads to siltation in the pipelines, and in the second case, silting and clogging of inspection and rotary wells occurs as a result of the removal of mechanical contaminants from the flume part of the well by forces inertia. Properly selected pipelines and a correctly constructed profile, if necessary, with differential wells will ensure reliable and economical operation of the system.
  • When designing internal sewerage systems, one of the main mistakes is the inconsistency of solutions with adjacent communications and with suspended ceilings and niches, which leads to a violation of the design idea of ​​​​the room.
  • Since the internal sewerage system is a gravity-flow system, preliminary routing and coordination of solutions with adjacent networks, linking with the design project, additional detailing of individual nodes allows the implementation of planned solutions at the lowest cost.
  • Technical shortcomings that cause difficulties in the operation of the sewerage system: lack of reinforcement of socket connections under the suspended ceiling, insufficient number of revisions, counter-slopes, violations of the rules for installing ventilation of risers, lack of sound insulation on PVC pipelines near residential premises.
  • By thinking through all the “little things” at the design stage, you can avoid significant costs for operation, maintenance and reconstruction of the building’s sewerage system.

List of initial data for sewerage design

  1. Technical conditions of Vodokanal or supplying organization.
  2. The act of choosing a route for external sewerage, agreed upon in the prescribed manner.
  3. Technical requirements for the designed sewerage system for the materials used, shut-off and control valves, wells and chambers, conditions for construction and installation work.
  4. Technical conditions for crossing roads and railways.
  5. Technical conditions for crossing water barriers (river, lake, etc.)
  6. Requirements for the need to install additional inspection wells for technological connection in the future.
  7. Engineering survey materials (geology, geodesy, ecology) (the full scope of surveys is required when undergoing the examination of design documentation).
  8. Requirements for the breakdown of sewer network construction into stages.

Relaying of intra-block sewerage with installation of a temporary pumping station and bypass lineDetailing of the bypass line and temporary pumping station.Plan of pressure sewerage from sewage pumping station to sewage treatment plant.Pressure sewer profile.

Designing sewerage networks is a complex engineering process that requires highly qualified specialists, since even the most minor miscalculations in the design and modeling of the sewerage system of a microdistrict can lead to a significant increase in both capital and operating costs, and can also hinder the further development of the area.

Cost of designing external sewer networks

Pipeline type and installation location Cost from (rub/m.p.) incl. VAT
up to 100mm up to 500mm up to 1000mm from 1000mm
Sewer connection project for a private house (per project) 40 000
City sewer networks 150 210 350 individually
Village sewer networks 120 160
Sewage networks of enterprises 135 180-210 350
Sewage networks in the "field" 150 300
*cost is given for the development of a working draft of the Tax Code section
*cost is given for the design of gravity sewer networks (for pressure sewer networks it is permissible to accept a reduction factor of 0.8 (the cost of the sewerage system is determined separately))
*price does not include approvals
*development of crossings over roads and railways and installation of siphons is not included

Region LLC specialists have significant experience in designing sewer networks of various capacities. Our specialists are also involved in hydraulic modeling and development of urban drainage schemes .

WE WILL BE HAPPY TO ANSWER YOUR QUESTIONS
You can contact us from 9.00 – 18.00 (Monday – Friday). Our specialist will always answer your questions and advise on possible solutions to certain problems by phone or upon request by email [email protected] . by number Our Skype: dc-region Our Telegram by number
We produce and supply equipment for treatment facilities, water supply and sewerage
We produce non-standard equipment in the field of water and sewerage treatment, as well as complete prefabricated installations:

Sewerage

  • Surface runoff treatment plants Questionnaires ( doc , pdf , zip )
  • Wastewater treatment facilities Questionnaires ( doc , pdf , zip )
  • Industrial wastewater treatment plants Questionnaires ( doc , pdf , zip )
  • Complete sewage pumping stations Questionnaires ( doc , pdf , zip )

The equipment is certified on the territory of the Russian Federation.

The main difficulties and mistakes in preparing for design

The main difficulties and mistakes when designing yourself (with your own hands) Solutions LLC "Region"
  • Lack of an agreed upon design of the Sanitary Protection Zone (SPZ)
  • We will analyze the current situation and prepare Terms of Reference for the SPZ project. If necessary, we will carry out the design of the sanitary protection zone and coordinate it.
  • Lack of metering devices and objective (calculated) data on the required productivity.
  • We will collect all the necessary data, carry out calculations and present it to the customer for consideration. If necessary, we will carry out temporary installation of metering devices.
  • Lack of title documents for land.
  • We will assist in the preparation of documentation and, if necessary, include it in the design specifications.
  • Inaccuracies in the preparation of the Technical Specifications: all necessary research was not taken into account, the above listed documents were not taken into account.
  • We will analyze the current situation and prepare the correct technical specifications.
  • The price justification was not carried out correctly, based on commercial proposals from non-specialized organizations, without taking into account compliance with the requirements of technical specifications, the need to inspect buildings and structures, etc.
  • We will prepare an estimate for design and survey work and inspection, according to reference price guides.
  • Surveys, surveys, and design are carried out by different companies, which causes delays and additional work.
  • We have significant experience and qualifications to organize a full range of design and survey work. The Region company has SRO approvals for both design and survey work. We are guaranteed to provide a positive expert opinion and support during construction and installation work.
To date, Region LLC has more than 150 successfully completed survey and design works. Our customers are the largest organizations in Russia. Numerous official reviews from organizations confirm our professionalism and responsibility in working with customers.

BIM DESIGN

We have experience in using BIM design technologies and are ready to develop a BIM project, taking into account customer requirements and technical specifications. Technological BIM design is a special art that requires extensive experience and high qualifications, which Region LLC collected bit by bit.
Models of equipment for sewage treatment facilities for industrial wastewater of a textile enterprise

General view of the model of the fluorine-containing wastewater neutralization complex

Sectional model of a sewage treatment plant building with equipment

COST OF PROJECT DEVELOPMENT

To determine the basic (initial) cost of design estimates and survey work, Region LLC uses a time-tested method: drawing up estimates for design and survey work using reference price reference books. The estimated cost of design and survey work is a justified initial cost of work, which is clarified in the process of clarifying the scope of work and negotiations. An estimate for design and survey work compiled according to reference price reference books can serve as a justification for the price during the competitive procedure in accordance with Federal Law No. 44 and No. 223.
Government customers For commercial customers
Assistance in completing applications for participation in Federal Target Programs (FTP).We make all technical and technological decisions based on variant design and comparison of all technical and economic parameters, including operational ones.
Assistance in processing applications for funds from regional budgets (feasibility study, Justification).Development of a feasibility study (feasibility study) of the project at the initial stages of implementation of the investment plan.
Consultations on lending from European banks and attracting grants.Assistance in attracting credit funds for the implementation of energy service contracts (energy efficiency) and environmental projects.
Assistance in the development of investment programs.Consulting in the field of design, design stages, design stages, approvals, necessary initial permitting documentation, etc.
Assistance in attracting credit funds for the implementation of energy service contracts (energy efficiency) and environmental projects.
is part of a number of large design and construction holdings and is ready to implement turnkey projects throughout Russia.

BY STARTING COOPERATING WITH US YOU WILL SAVE

30%Costs of construction and installation works. Based on alternative design and modern technologies, we select the optimal solution. 3D modeling technologies help to avoid waste of materials and minimize the likelihood of errors.
25%For the cost of design and survey work, you get a high-quality project that allows you to implement your plan on time. Thanks to an integrated approach, everything is in one hand (collection of initial data, surveys and measurements, surveys) and the experience of our specialists, we can optimize costs and offer you a competitive price.
20%Time during construction and installation work. The decisions made by our engineers and architects are not only reliable and aesthetic, but also thought out in terms of convenience and speed of implementation (flexible solutions in terms of work execution).

As part of the design contract, we always stipulate warranty obligations and financial liability for failure to meet deadlines.

WE WILL PREPARATE ALL TECHNICAL SPECIFICATIONS

For designFor examinationFor researchTo develop the scheme

Region LLC specialists are ready to provide assistance at all stages of decision-making, both at the stage of considering the project concept and when considering options for the reconstruction of existing buildings and structures. At the design preparation stage - prepare technical specifications for design and the necessary research. And also prepare estimates for design and surveys based on collections of basic prices (price justification for holding a competition).

HOW WE DESIGN

  1. Customer's idea
  2. Preparation of pre-design solutions and variable design
  3. Development of technical-economic feasibility study (feasibility study)
  4. Protection of basic solutions to the customer, selection of the optimal option
  5. Preparation of detailed technical specifications for: project development, engineering surveys, survey
  6. Development of working documentation
  7. Examination of design and estimate documentation
  8. Approvals
  9. Author's supervision
  10. The customer's vision embodied

LICENSES AND CERTIFICATES REGION LLC


Region LLC is a member of voluntary quality certification in accordance with GOST R ISO 9001-2015. Registration No. SMK.RTS.RU.03121.17


Since January 11, 2018, he has been a member of the SRO of the E.S.P. Association.


Since January 11, 2018, he has been a member of the SRO of the E.S.P. Association.

WE WORK ON LICENSED SOFTWARE

We design on nanoCAD - a Russian universal CAD platform containing all the necessary tools for basic design and drawing production.Our PCs are equipped with Windows 10, an operating system for personal computers developed by Microsoft as part of the Windows NT family. After Windows 8, the system received the number 10, bypassing 9. We work on Microsoft Office 2010 - a package of programs focused on the requirements of modern business and the needs of its employees.
The use of licensed software guarantees information security, legality of work and reduces the risks of company closure due to inspections by regulatory authorities.
GUARANTEES FOR THE PROJECT Region LLC always assumes warranty obligations for “industrial objects”. We provide supervision and construction support and promptly resolve all issues that arise during the construction of the facility.
Video message from the director of Region LLC

Dear colleagues, partners, customers!

One of the main activities of my company is the design of water disposal and sewerage facilities, treatment facilities and utility networks.

When designing, we use advanced technologies in the field of drainage and do not impose on the customer equipment that we produce ourselves.

This approach allows us to choose the optimal solution and ensure maximum efficiency of the investment and environmental project.

I am always ready for constructive dialogue.

I am confident that I can offer YOU the best conditions for the implementation of your project!

Call +7 (812) 627-93-38
Sincerely, General Director of Region LLC
Alexey Vladimirovich Shchukin

KaliningradSevastopolRostov-on-Don
MoscowNizhny NovgorodNovokuznetsk
SamaraNizhnevartovskKrasnodar region
KhabarovskKrasnoyarskVladivostok
PermianRepublic of KareliaArmavir
PskovArkhangelskTomsk
VolgogradTyumenUlan-Ude
NovosibirskKazanEkaterinburg
LipetskChelyabinskUfa
KalugaSlavyansk-on-KubanPetrozavodsk
OrenburgBratskIrkutsk
MonchegorskUst-Ilimsk

We are engaged in complex design throughout Russia and are looking for representatives in Murmansk, Vologda, Syktyvkar, Omsk, Voronezh and other Russian cities.
We see all participants in the construction market as our partners and are ready for long-term mutually beneficial cooperation with suppliers, manufacturers of equipment and materials, builders, developers, developers and manufacturing enterprises, and even with design organizations we build honest partnerships.

What should a sewer system project include?


Sewerage project in a private house
The compiled project ideally represents a detailed axonometric diagram of the elements of all planned sewer lines, indicating:

  • the amount of materials needed and their sizes;
  • location and number of planned sanitary equipment, pipes extending from it, as well as a riser;
  • sections with pipeline turns;
  • if necessary, pumping equipment;
  • places for passing pipes and installing wells for external networks.

We give gifts to our clients!

When ordering a project for an amount over 1 ml. rubles we give away an Apple MacBook Air or a discount of up to 5% !
When ordering a project worth more than 500t. rubles we give Conquest Knight S8 Pro or estimate as a gift !

We work all over RussiaContacts. Tel/f +; [email protected] Author G+
You can contact us from 9.00 – 18.00 (Monday – Friday). Our specialist will always answer your questions and advise on possible solutions to certain problems by phone or upon request by email [email protected] . by number Our Skype: dc-region Our Telegram by number

we are in social networks

  • Terms of use
  • Personal data processing policy

State regulation and recommendations

Before starting the development of the project, we recommend that you familiarize yourself with the MDS Manual 40–2.2000. This is an extremely useful collection on the development of autonomous utility networks for a private house with a large volume of requirements, definitions, mandatory and recommended system parameters.

The following may also be useful:

  1. GOST 25150–82 - terms.
  2. SNiP 2.04.01–85 - for the development of internal sewerage.
  3. SNiP 2.04.03–85 - for the development of external sewerage.
  4. SP 31–106–2002, r.5 – sewerage system for single-family houses.

In the text of these documents, you can find and clarify controversial or questionable issues that arise during the design.

Internal sewer system


Laying a sewer system in a private house
The intra-house sewer network includes one or more central vertical pipes, or risers, to which horizontal pipes of smaller diameter are suitable. Through them, wastewater moves by gravity or under the action of a circulation pump from washbasins, bathtubs, toilets, etc. After the riser, household waste flows into pipes of even larger diameter, which are connected either to the central sewer system or to a private house collection system, and possibly wastewater treatment.